Advanced Project Controls Practitioner Programme

Stop supporting the controls function.
Start leading it.

From technical expertise to integrated project controls

An online, practitioner-led programme for experienced engineers and construction professionals. Over six leadership mandates you direct planning engineers, review and sign off their work, lead the EOT claim and brief management — then apply it in your own role with three months of mentored follow-up.

Online · recorded lessons + live reviews3 + 3 months · programme + follow-up3–15+ years · experienced professionals
MANDATE BOARD · WEEKS 1–12LEADPECAQSPROGRAMMEMENTORED FOLLOW-UP
3+3Months · programme + follow-up
6Leadership mandates
9Modules
12Assessed deliverables

Programme format

Three months to build it. Three months to prove it.

Twelve weeks of intensive, practitioner-led work on one project, then twelve weeks of mentored follow-up while you apply it in your own role.

Months 1–3 · The programme

Lead the controls function on Orion

  • Six leadership mandates and nine modules
  • Twelve assessed deliverables, each signed off by you as the lead
  • EOT claim defended live before a mock Engineer panel
  • Power BI dashboard briefed live to a mock management board
  • Programme certificate on completion of all assessed work

Months 4–6 · Mentored follow-up

Apply it in your own role, with a mentor behind you

  • A one-to-one online review with your EDGE mentor every month
  • Apply the methods to your own project and bring real problems to your mentor
  • Complete your Leadership Evidence Pack
  • Readiness review and mentor endorsement at the end of month 6

Programme structure

Your programme, baselined.

We planned the programme the way you will plan a project. Move the data date to see which mandates you will have led, what is in your portfolio, and the role you hold that week.

Programme baseline · 12 weeks + 12 weeks follow-upData date: Week 1
Critical pathRuns in parallelMentored follow-up
Elapsed
4%
Mandates led
0 / 6
In your portfolio
0 / 12
Your role
Lead Planner

The gap

Senior engineers answer for their scope. Controls leaders answer for the project.

You have run works, signed off quality, priced the BOQ or managed subcontracts. Directors and clients now expect someone to tell them, with evidence, whether the project will finish on time and on budget — and who carries the delay.

AreaWhat you are asked todayWhat a controls leader must answer
TimeIs my activity on programme?Will the project finish on time, what drives the forecast, and what is the recovery decision?
ProgressWhat did my crew complete?How much has the project earned, and is the measurement defensible?
CostWhat is my package budget?What will the project cost at completion?
DelayWhy did my activity slip?Who carries the delay, was notice given in time, and how many days can we prove?
ReportingSend me your figuresWhat does the board need to decide this month?
PeopleDo my own work wellDirect planners and analysts, review their output and develop them

The difference

Primavera is a tool. Leading project controls is the job.

Twelve capabilities expected of a project controls leader. Switch between routes to see what each one covers.

12/12capabilities covered

    How it works

    Learn. Lead. Mentor. Defend.

    Every mandate follows the same pattern. You are not marked for watching; you are judged on the work you lead and how well you stand behind it.

    01

    Learn the method

    Recorded, practitioner-led lessons on the technique and the standard expected. Study at your own pace. About 30% of the programme.

    02

    Lead the work

    Take the mandate's lead role and allocate tasks to the planning engineers, cost analysts or claims analysts in your online syndicate. About 70% of the programme.

    03

    Review and mentor

    Review and sign off your team's output before it is submitted, and give structured feedback to your peers.

    04

    Defend it

    Every deliverable is marked with written feedback. In key mandates you present your work live online before a panel or a mock board.

    What is recorded and what is live

    ElementFormatWhen
    Lessons on every methodRecordedYour own pace
    Syndicate work on OrionOnline, team-basedEach mandate
    Marking of 12 deliverablesWritten feedbackAfter each submission
    EOT claim panel defenceLive onlineMandate 4
    Management board briefingLive onlineMandate 5
    Integrated report presentationLive onlineMandate 6
    Mentor one-to-one reviewsLive onlineMonths 4, 5 and 6

    The standard you are held to

    • Every deliverable is reviewed as if it were going to a client or an Engineer
    • Every fact in a claim must point to a record
    • Every forecast must be explained, not just reported
    • Work that falls short is returned for rework before it is accepted
    • You learn from a project controls consultancy: the practitioners who mark your work do this work for clients

    Curriculum

    Six leadership mandates, one continuous project.

    Each mandate gives you a role, a team to direct, decisions to sign off and work to defend. All nine modules sit inside the mandates. Filter by what you want to lead.

    1Establish controlYour role: Lead Planner · Weeks 1–3
    You lead

    A syndicate of planning engineers building the controls framework, WBS, risk register and the Primavera P6 baseline

    You review & mentor

    Their logic, calendars, durations, resource and cost loading, and the DCMA 14-point check

    You sign off

    The planning basis and the baseline programme

    Modules

    M1 Introduction to Project Planning & Controls · M2 Project Scheduling, Monitoring & Progress Measurement

    Topics

    • Project controls terminology, organisation and life-cycles
    • Risk analysis and project controls procedures
    • Scheduling, CPM, resource management and levelling
    • Baseline setting and Primavera P6 advanced operations; MS Project
    • DCMA 14-point schedule health check

    Deliverables

    • 01Baseline programme
    • 02Schedule update

    Leadership competency

    Set up a project controls system and stand behind a baseline the whole project will be judged against.

    2Drive performanceYour role: Performance Lead · Weeks 4–5
    You lead

    Progress measurement and earned value across the Orion packages

    You review & mentor

    Your team's weightage system, measurement methods, S-curves and EVM calculations

    You sign off

    The progress report and the variance explanation that goes to management

    Module

    M4 Progress Measurement & Performance Tracking

    Topics

    • Progress measurement systems and weightages
    • Earned value: PV, EV, AC, SPI, CPI and EAC
    • S-curves, variance analysis and progress forecasting

    Deliverables

    • 03Progress report
    • 04EVM analysis

    Leadership competency

    Hold the team to one defensible measurement standard and explain variance to management.

    3Command the cost positionYour role: Cost & Commercial Lead · Weeks 6–7
    You lead

    Cost loading, cash flow, BOQ mapping and the commercial review of Orion

    You review & mentor

    Your cost analysts' loading sheets, cash flow projection and cost variance analysis

    You sign off

    The cost report and the cash flow position

    Modules

    M3 Cost Control & Budgeting Techniques · M5 Cost Engineering, Estimation, BOQ & Commercial Awareness

    Topics

    • Cost control, expenditure, commitments and change control
    • Budgeting, forecasting, cost loading and cash flow
    • Estimating, BOQ, procurement and subcontractor management
    • Commercial awareness

    Deliverables

    • 05Cost report
    • 06Cash flow

    Leadership competency

    Own the cost position and defend it to commercial management.

    4Defend time and moneyYour role: Claims & EOT Lead · Weeks 8–9
    You lead

    The delay analysis and EOT claim, using the baseline, updates, records and cost data from mandates 1–3

    You review & mentor

    Your claims analysts' notices, fragnets and delay analysis before they reach the Engineer

    You sign off

    The notice of claim, the delay analysis method and the claim submission

    Module

    M6 Contracts, Delay Analysis, EOT & Claims (FIDIC)

    Topics

    • FIDIC 1999 and 2017 time provisions and claims, compared with NEC4 and JCT
    • Notices, time bars and contemporaneous records
    • Delay classification, float and concurrency (SCL Protocol)
    • As-planned vs as-built, impacted as-planned, collapsed as-built, TIA and windows analysis in P6 (AACE RP 29R-03)
    • Quantum: prolongation, head-office overheads, disruption, acceleration
    • Claim preparation, the Engineer's assessment and the dispute route

    Deliverables

    • 07Notice of claim
    • 08Delay analysis
    • 09EOT claim and panel defence

    Leadership competency

    Take a contractual position on time and money, prove it, and defend it under questioning.

    5Brief managementYour role: Reporting Lead · Weeks 9–10
    You lead

    The executive dashboard built from P6 data, and the use of AI tools in controls work

    You review & mentor

    Your team's data model and visuals, and the checks on anything AI produces

    You sign off

    What goes in front of management — and you present it live

    Modules

    M7 Advanced Data Analytics using Power BI · M8 Introduction to AI in Project Controls

    Topics

    • Power BI data modelling and dashboard design from P6 data
    • Progress curves, EVM visuals and executive summaries
    • AI-assisted scheduling, forecasting and automated reporting
    • Ethics and verification of AI outputs

    Deliverables

    • 10Power BI dashboard and briefing
    • 11AI exercise

    Leadership competency

    Decide what management needs to see, and brief it clearly.

    6Lead the integrated functionYour role: Head of Project Controls · Weeks 11–12
    You lead

    Orion end to end, across time, cost, contract and reporting

    You review & mentor

    The contributions of each lead in your syndicate to one coherent monthly report

    You sign off

    The final integrated report, the presentation and your portfolio

    Module

    M9 Integrated LIVE Project Case Study & Professional Reporting

    Topics

    • Integrated project controls exercise
    • Stakeholder management and team leadership
    • Management reporting standards and presentation skills
    • Portfolio development

    Deliverable

    • 12Final project report and presentation

    Leadership competency

    Run the controls function as one system and report it at senior level.

    Integrated case study

    Orion Commercial Tower. You are in charge of its controls.

    One project runs through the whole programme: a Dubai commercial tower under FIDIC Red Book-based conditions. You plan it, update it, cost it, analyse its delays, claim its time and report it.

    22 levels3B + G + M + 16 + roof
    AED 180mContract value
    30 monthsJan 2026 to Jun 2028
    FIDICRed Book-based
    2,000+Activities in the P6 baseline
    8Monthly P6 updates

    All figures are training case study assumptions, not actual project data.

    PV · EV · AC — STATUS M831-AUG-26FORECAST FINISH +15 DAYS

    Run the numbers yourself

    Earned value at the August 2026 status

    The arithmetic you sign off as Performance Lead. Training values, AED million.

    SPI
    CPI
    SV
    CV
    EAC
    VAC

    The notice clock

    Where do you stand on the status date?

    As Claims & EOT Lead you own the deadlines. Under FIDIC (1999 Sub-Clause 20.1; 2017 Sub-Clause 20.2) notice is due within 28 days of becoming aware of the event.

    Notice due
    Detailed claim due (1999 · 42 days)
    Detailed claim due (2017 · 84 days)

    Status date 31-Aug-2026. Awareness dates are training assumptions.

    Assessment

    Three moments that test you as a leader — all live online.

    The programme is demanding by design. These are the points where you stand in front of others and answer for your work.

    01

    Defend the EOT claim

    A 20-minute session before a mock Engineer panel that questions entitlement, causation, method and quantum.

    02

    Brief the management board

    Present your Power BI dashboard to a mock management board and answer for what it shows and what you recommend.

    03

    Present the integrated report

    As Head of Project Controls, present the final project report and portfolio as you would to a client.

    Evidence

    Twelve things you can put in front of a director.

    Every deliverable is signed off by you as the lead, marked and returned with written feedback. Together they form the portfolio you leave with.

    1. Baseline programmeLead Planner
    2. Schedule updateLead Planner
    3. Progress reportPerformance Lead
    4. EVM analysisPerformance Lead
    5. Cost reportCost & Commercial Lead
    6. Cash flowCost & Commercial Lead
    7. Notice of claimClaims & EOT Lead
    8. Delay analysisClaims & EOT Lead
    9. EOT claim and panel defenceClaims & EOT Lead
    10. Power BI dashboard and briefingReporting Lead
    11. AI exerciseReporting Lead
    12. Final project reportHead of Project Controls
    The portfolio is assessed work on a simulated project. It demonstrates leadership and technical capability; it is not employment experience and should not be presented as work on a real project.

    Months 4–6

    Mentored follow-up: from Orion to your own projects.

    After the twelve-week programme you go back to your own work — with an EDGE mentor behind you.

    Week 12

    Programme complete

    All twelve deliverables marked; programme certificate issued.

    Month 4

    First mentor review

    Agree where you will apply the methods at work and the evidence you will bring.

    Month 5

    Second mentor review

    Review what worked on your own project, what did not, and your next step.

    Month 6

    Readiness review

    Present your Leadership Evidence Pack; your mentor completes the readiness endorsement.

    In each review

    • A live online one-to-one with your EDGE mentor
    • You bring a real problem from your own work: a schedule, an update, a cost report or a delay event
    • Your mentor challenges your approach the way a senior controls manager would
    • You leave with one agreed action and the evidence to bring next time

    Your Leadership Evidence Pack

    Six short forms record how you led, reviewed and mentored your syndicate.

    • L1Mandate Leadership Plan
    • L2Work Allocation and Review Register
    • L3Mentoring and Feedback Record
    • L4Mandate Close-out and Decision Log
    • L5Prior Professional Leadership Declaration (optional)
    • L6Leadership Readiness Statement and Mentor Endorsement

    On completion

    One programme. One certificate. One endorsement.

    Awarded subject to successful completion of all programme requirements and assessments. Nothing is automatic on enrolment.

    • Programme certificateEnd of month 3, when all twelve deliverables and the live assessments are complete
    • Mentor endorsementEnd of month 6, recording the leadership you demonstrated and your readiness for your next step
    • Leadership portfolioYour twelve deliverables, including the claim you defended and the dashboard you briefed
    • VerificationEmployers can verify an issued certificate online
    EDGEPROJECT CONTROLS F.Z.ECERTIFICATE NO.[CERTIFICATE NO.]CERTIFICATE OF COMPLETIONParticipant Full Namehas successfully completed theAdvanced Project Controls Practitioner ProgrammeSIX LEADERSHIP MANDATESMENTORED FOLLOW-UPPROGRAMME DIRECTORLEAD ASSESSORVERIFY ONLINEEDGE Project Controls FZE

    Certificate design · illustration

    Career pathways

    Built for the next step up.

    The programme develops the competencies expected of senior and management roles in project controls, and the evidence to show them.

    Senior Planning EngineerPlanning ManagerProject Controls EngineerProject Controls ManagerCost Control ManagerDelay AnalystEOT & Claims SpecialistHead of Project Controls

    Roles aligned to programme capability. The programme does not guarantee employment, promotion, salary or a job title; senior roles also depend on your prior experience.

    Who should join

    Experienced professionals, typically 3 to 15+ years.

    • Construction managers and senior site engineers
    • QA/QC managers and engineers
    • Quantity surveyors, estimators and cost engineers
    • Contracts and commercial professionals
    • Planning and project controls engineers ready to lead the function
    • No prior Primavera P6 experience is assumed. You need a computer able to run Primavera P6 and Power BI, a reliable connection, camera and microphone.

    Compare

    Where this programme sits in the EDGE pathway.

    CPPE builds the planning engineer. AIPPC builds the complete project controls engineer. The Practitioner Programme prepares experienced professionals to lead the function.

    CPPEAIPPCPractitioner Programme
    Best suited toGraduates and site engineers moving into planningGraduates and early-career engineersWorking professionals, 3–15+ years
    Duration50 days6 months (3-month fast track)3 months + 3 months mentored follow-up
    DeliveryClassroom or onlineClassroom / OnlineOnline: recorded lessons + live reviews
    Delay analysis and claimsIntroductoryAppliedFull set of methods, EOT claim and quantum
    Leading and mentoring a teamNot coveredTeam-based project workCore of the programme
    Live presentationsLive project presentationFinal presentationPanel defence, board briefing, integrated report

    FAQ

    Questions, answered.

    Is this programme an internship?
    No. It is an online professional development programme for experienced professionals. Participants are not employed by EDGE Project Controls FZE, and the case-study work is a learning exercise.
    How is it delivered?
    Online. Lessons are recorded so you can study around your working week. The EOT claim panel defence, the board briefing, the integrated report presentation and the mentor reviews are live online sessions.
    How long does it take?
    Three months for the programme itself, followed by three months of mentored follow-up with a one-to-one review each month.
    Will I actually lead and mentor others?
    Yes, within the programme. In syndicate work you take lead roles, allocate tasks to the planning engineers and analysts in your team, review and sign off their output, and give your peers structured feedback. Roles rotate so everyone leads. This is leadership practice on a simulated project, not employment.
    Are Primavera P6, MS Project, EVM and Power BI included?
    Yes. You lead the P6 baseline and updates, the earned value analysis and cost position, and build a Power BI dashboard that you brief live to a mock management board.
    Are delay analysis, EOT and FIDIC included?
    Yes. In mandate 4 you lead notices, delay analysis in P6 and an EOT claim under FIDIC 1999 and 2017 provisions, compared with NEC4 and JCT, and defend it before a mock Engineer panel.
    What do I receive?
    A programme certificate at the end of month 3, a mentor readiness endorsement at the end of month 6, and your portfolio of twelve deliverables.
    Does it guarantee a promotion or a job?
    No. It builds and evidences the capability senior roles require. Outcomes depend on your experience, performance and employer requirements.
    How do I ask about fees and the next intake?
    WhatsApp an advisor on +971 505052387 or email contact@projectcontrolsedge.ae. You can enrol anytime.

    Enquire

    You have the experience. Take the lead.

    Six mandates. Nine modules. One tower. Three months of mentoring. Talk to an advisor about the next intake and fees.

    Tel / WhatsApp +971 505052387contact@projectcontrolsedge.aeC1 Building, Ajman FZE, UAE