AIPPC Internship Assignment Pack
EDGE Project Controls Academy
Assignment Modules
Module 1 – Introduction to Oil & Gas EPC Projects
Assignment 1: EPC Lifecycle Mapping
Task: Create a full EPC workflow map.
Output: PDF/PPT diagram.
Assignment 2: Contract Model Comparison
Task: Compare EPC, EPCM, LSTK, Reimbursable.
Output: Word/PDF table.
Module 2 – Work Breakdown Structure (WBS)
Assignment 3: WBS for Hydrotreater Unit
Task: Create a 7-level WBS.
Output: Excel + dictionary.
Assignment 4: WBS–CBS Mapping
Task: Map 20 WBS items to cost codes.
Output: Excel sheet.
Module 3 – Engineering Planning & Controls
Assignment 5: Engineering Deliverable Register
Task: Create EDR with 50 deliverables.
Output: Excel register.
Assignment 6: PEC Calculation
Task: Calculate PEC & plot progress.
Output: Excel + chart.
Module 4 – Procurement Planning
Assignment 7: Procurement Register
Task: Build PR with RFQ, TBE, PO, FAT, delivery.
Output: Excel PR sheet.
Assignment 8: Procurement Critical Path
Task: Identify critical packages.
Output: PDF/Word report.
Module 5 – Construction Planning
Assignment 9: Construction Sequence Plan
Task: Prepare method statement.
Output: PDF.
Assignment 10: Workfront Availability Study
Task: Identify 5 constraints.
Output: Short report.
Module 6 – Piping & Hydrotest Management
Assignment 11: Weld DI Calculation
Task: Calculate dia-inch & productivity.
Output: Excel.
Assignment 12: Hydrotest Pack
Task: Create hydrotest index & 1 sample pack.
Output: Excel + PDF.
Module 7 – Commissioning & System Completion
Assignment 13: Systemization Matrix
Task: Create 10 systems + 30 subsystems.
Output: Excel matrix.
Assignment 14: Punch List Management
Task: Create punch log & sample items.
Output: Excel sheet.
Module 8 – Cost Control & Budgeting
Assignment 15: CBS Development
Task: Create 6-level CBS.
Output: Excel file.
Assignment 16: EVM Calculation
Task: Compute SPI, CPI, ETC, EAC.
Output: Excel + summary.
Assignment 17: Cash Flow Curve
Task: Create baseline, actual, forecast S-curves.
Output: Excel graph.
Module 9 – Risk Management
Assignment 18: Risk Register
Task: Build risk register with 15 risks.
Output: Excel sheet.
Assignment 19: Schedule Risk Simulation
Task: Explain vendor delay impacts.
Output: Report.
Module 10 – Reporting & Dashboards
Assignment 20: Weekly EPC Report
Task: Prepare 3–5 page report.
Output: PDF/Word.
Assignment 21: Dashboard Creation
Task: Build EPC dashboard.
Output: Power BI / Excel.
Module 11 – Primavera P6
Assignment 22: Build a Level-3 Schedule
Task: Build 200-activity EPC schedule.
Output: .xer file.
Assignment 23: Schedule Update & Recovery
Task: Update delays & propose recovery plan.
Output: .xer + narrative.
Module 12 – Final Internship Deliverables
Assignment 24: Integrated Dashboard
Task: Create integrated EPC dashboard.
Output: Excel/Power BI.
Assignment 25: Final Presentation
Task: Prepare 10-slide presentation.
Output: PPT.